At Birmingham Airport – Alpha Bund 7, our team delivered the design, manufacture and installation of the ground-mounted solar mounting system for this 6.9MW solar project. We worked with Evo Energy Limited, with Birmingham Airport Limited as the end customer, using our HTR System 4.1 – 4 in landscape mounting system with driven pile foundations.
The site presented a number of engineering and installation challenges. We installed 578 solar tables across more than 220 rows on both sides of a separation bund extending approximately 1.2 miles in each direction. Our mounting system had to work with the changing ground profile, where slopes varied between approximately 15° and 20° in two directions.
Our team designed the structure to suit these variable slopes while maintaining a consistent 23° solar table angle, helping the project meet the required aircraft glint and glare considerations.
Working alongside a live runway and taxiway added further complexity, with the project delivered under applicable Civil Aviation Authority requirements and conditions. Close coordination between our team, our customer, Birmingham Airport and the CAA was important throughout the project.
The project demonstrates how we can adapt our solar mounting systems, structural engineering and installation approach to suit challenging site conditions while keeping the system practical to manufacture, install and deliver.