Case Study

Brogborough Solar Farm – 40MW

A 40 MW ground-mount solar development using HTR Solar’s mounting system, engineered for large-scale deployment across the restored Brogborough landfill site.

Location
Brogborough, Bedfordshire, UK
Project Size
40MW
Overview

About This System

At Brogborough, a former landfill site is being transformed into part of the UK’s next generation of clean-energy infrastructure.

HTR Solar is supplying the ground-mount solar mounting system for the 40 MWp Brogborough Solar Farm, supporting the delivery of a large-scale renewable energy project across the restored landfill site.

The project forms part of the wider Brogborough Clean Energy Hub, where new solar generation is being developed alongside existing energy infrastructure. For HTR Solar, the scale of the project is significant, but equally important are the ground conditions and the engineering considerations associated with developing solar on previously used land.

Our mounting system is engineered around the requirements of the site, considering structural loading, foundation conditions, connection detailing, constructability and the need for efficient, repeatable installation across a large utility-scale development.

Brogborough represents more than a large-scale solar project. It is the transformation of previously used land into a productive renewable energy site, combining established energy infrastructure with new solar generation.

HTR Solar is proud to contribute the mounting system supporting this next chapter for the site — providing the structure beneath a project that gives the land a new purpose in clean-energy generation.

The Site

Key Engineering Challenges

Restored Landfill Conditions-Developing a large-scale solar project across a restored landfill requires the mounting solution to respond carefully to the site's ground conditions and constraints.

40 MWp Scale-The size of the development demands a mounting system that can be manufactured and deployed efficiently and consistently across thousands of module positions.

Foundation Strategy-Foundation requirements must respond to varying site conditions while providing the stability and structural performance required across the development.

Efficient, Repeatable Installation-At this scale, connection detailing and structural configuration need to support fast, practical and repeatable installation while maintaining long-term performance.

Project Type

Ground Mounting

Enquire About This System

Specifications are tailored to each site. Send us your layout and ground conditions and we'll confirm the arrangement for your project.

Have a Project Like This?

Share your site details and we'll design a mounting solution around them.

Get a Quote