Case Study

Shannon Airport- 1.2MW

1.2MW airport solar project using HTR Solar’s S4.1 2P system, engineered around live taxiways, jet-blast effects and enhanced wind requirements.

Location
Shannon Airport, Ireland
Project Size
1.2MW
Overview

About This System

At Shannon Airport, engineering had to work around aviation.

HTR Solar supported the delivery of the 1.2MW ground-mounted solar PV farm, providing the design, manufacture and installation of our S4.1 2P mounting system with driven pile foundations.

This was not a conventional solar site. The array sits within a live airport environment, positioned between four operational taxiways, where every part of the design had to consider not only structural performance, but also aircraft movement, safety and operational continuity.

Jet blast was one of the key design considerations. Dedicated studies were carried out to understand the forces created as aircraft manoeuvred along the surrounding taxiways. The results directly influenced the final layout, leading to the removal of two rows and the relocation of selected perimeter tables.

Wind loading also required particular attention. Enhanced wind-speed allowances set by the airport authorities and technical advisers were incorporated into our structural design, ensuring the mounting system could perform reliably within this demanding environment.

For HTR Solar, this project is a strong example of what good solar engineering should be: understanding the site, responding to real-world constraints and designing the structure around them.

The result is a mounting system engineered not just for the solar modules above it, but for the unique environment around it — supporting renewable energy generation within one of Ireland’s busiest aviation settings.

The Site

Key Engineering Challenges

Live Airfield Environment-The solar array was positioned between four operational taxiways, requiring the mounting system and layout to work safely around continuous aircraft movements and strict airport operational requirements.

Jet Blast Effects-Aircraft manoeuvring close to the array introduced unusual loading conditions. Dedicated jet-blast studies informed the structural and layout decisions, including the removal of two rows and relocation of selected perimeter tables.

Enhanced Wind Requirements-Airport authorities and technical advisers required increased wind-speed allowances beyond standard site assumptions. These requirements were incorporated into HTR Solar’s structural analysis and system design.

Designing Around the Site-Rather than making the site fit a standard system, the S4.1 2P mounting solution was engineered around the airport’s constraints — balancing structural performance, driven pile foundations, array geometry and operational safety.

Project Type

Ground Mounting

Enquire About This System

Specifications are tailored to each site. Send us your layout and ground conditions and we'll confirm the arrangement for your project.

Have a Project Like This?

Share your site details and we'll design a mounting solution around them.

Get a Quote